{"id":1241,"date":"2024-10-27T07:17:26","date_gmt":"2024-10-27T07:17:26","guid":{"rendered":"https:\/\/zampenjournal.news\/?p=1241"},"modified":"2024-11-15T21:02:43","modified_gmt":"2024-11-15T21:02:43","slug":"dpwh-implements-p60-m-asphalting-project-in-sibugay","status":"publish","type":"post","link":"https:\/\/zampenjournal.news\/?p=1241","title":{"rendered":"DPWH implements P60-M asphalting project in Sibugay"},"content":{"rendered":"\n
Writer; Alex<\/p>\n\n\n\n
THE Department of Public Works and Highways (DPWH) has implemented a P60 million road asphalting project to extend the life cycle of the concrete road in a village in the province of Zamboanga Sibugay.<\/p>\n\n\n\n
The DPWH-Zamboanga Peninsula said the asphalting project was implemented in La Victoria village, Alicia, Zamboanga Sibugay.<\/p>\n\n\n\n
The completed project stretches 2.920 lane kilometers with a carriageway of 6.70 meters, the DPWH-Zamboanga Peninsula said.<\/p>\n\n\n\n
The asphalting project will also improve transportation efficiency and contribute to economic development aside from extending the life cycle of the concrete road.<\/p>\n\n\n\n
\u201cDesigned as a preventive maintenance strategy, the two-lane road asphalting not only enhances the travel experience for motorists but also extends the lifespan of the underlying concrete road, ensuring long-term durability and safety,\u201d the DPWH-Zamboanga Peninsula said in a statement.<\/p>\n\n\n\n
\u201cBy providing smoother and more efficient travel, the project is expected to improve transportation flow and contribute to the overall economic development of the region,\u201d the DPWH added.<\/p>\n\n\n\n
The P60 million funding allocation for the implementation of the project came from the General Appropriations Act 2024.<\/p>\n\n\n\n
The project was implemented by the DPWH Zamboanga Sibugay First District Engineering Office.<\/p>\n